TORRISH FOREST ACCESS BRIDGES

PROJECT DESCRIPTION

Assessment of bridges on access route for timber extraction; design of replacements for two culverts.

Client – Knut Damgaard

Completion – 2016

Value – £60,000

AREAS OF RESPONSIBILITY

Inspection for assessment; assessments for normal highway vehicles to BD21; design of two small span culverts replacing thin buried unreinforced slabs with precast deck units on precast block abutments.

PRINCIPAL ELEMENTS

  • Assessment of two masonry arches and two short span mass concrete buried slab culverts. Precast deck units
  • precast abutment blocks to speed site works and minimise crane size required.

KEY FEATURES

Minor road with restricted access; simplifying construction method reducing time on site with use of precast elements.

CONTRACTORS

Project Manager – Wallace Stone

Main Contractor – GMR Henderson