TORRISH FOREST ACCESS BRIDGES
PROJECT DESCRIPTION
Assessment of bridges on access route for timber extraction; design of replacements for two culverts.
Client – Knut Damgaard
Completion – 2016
Value – £60,000
AREAS OF RESPONSIBILITY
Inspection for assessment; assessments for normal highway vehicles to BD21; design of two small span culverts replacing thin buried unreinforced slabs with precast deck units on precast block abutments.
PRINCIPAL ELEMENTS
- Assessment of two masonry arches and two short span mass concrete buried slab culverts. Precast deck units
- precast abutment blocks to speed site works and minimise crane size required.
KEY FEATURES
Minor road with restricted access; simplifying construction method reducing time on site with use of precast elements.
CONTRACTORS
Project Manager – Wallace Stone
Main Contractor – GMR Henderson