STRATHOYKEL WIND FARM BRIDGE ASSESSMENTS
PROJECT DESCRIPTION
Inspection and assessment of bridges on A839 and A836 access route for wind farm for abnormal vehicles.
Client – E.On Climate & Renewables
Completion – 2013
Value – N/A
AREAS OF RESPONSIBILITY
Inspection; AIP and acceptance by Local Authority; Assessment; checking in accordance with AIP; Reporting.
PRINCIPAL ELEMENTS
- 4 single span masonry arches
- 1 two span (14.3m) masonry arch – Listed Structure
- 1 reinforced concrete arch (16.8m)
- 1 Bailey type panel bridge (39.6m)
KEY FEATURES
Assessment for abnormal loads, including checking for standard highway vehicles representing general construction traffic
CONTRACTORS
Project Manager – Wallace Stone