GALLOVIE BRIDGE STRENGTHENING
PROJECT DESCRIPTION
Assessment and strengthening of 1940s 3 span reinforced concrete beam bridge.
Client – Ardverikie Estate
Completion – 2015
Value – £33,000
AREAS OF RESPONSIBILITY
Concrete investigations; assessment for normal highway vehicles to BD21; design of strengthening of end spans with additional steel beams.
PRINCIPAL ELEMENTS
- Assessment of reinforced concrete deck slab and encased steel beams
- Supervision of investigation works to determine sections
- Design of new steelwork
KEY FEATURES
Steel beams with cross beam and flat jacks to provide additional support to end spans; design of fixings to existing structure.
CONTRACTORS
Project Manager – Wallace Stone
Main Contractor – McGowan Outdoor Access Ltd