ELGIN FLOOD ALLEVIATION SCHEME

PROJECT DESCRIPTION

Design checks on two temporary proprietary bridges on mass concrete block abutments.

Client – Morrison Construction Ltd

Completion – 2012

Value – N/A

AREAS OF RESPONSIBILITY

Design checks – bridge decks and substructure; checking effect of crane outrigger loads.

PRINCIPAL ELEMENTS

  • Design checks for public use and construction vehicles
  • Proprietary panel bridges, 33m and 18m span
  • Euroblock precast concrete abutment blocks

KEY FEATURES

Temporary bridges constructed for public and contractor access during construction of flood alleviation scheme.

CONTRACTORS

Project Manager – Wallace Stone

Main Contractors – Morrison Construction Ltd