DUNGAVEL WIND FARM A70 BRIDGE ASSESSMENTS
PROJECT DESCRIPTION
Inspection and assessment of a series of bridges on the A70 access route to the wind farm for abnormal vehicles.
Client – Natural Power
Completion – 2014
Value – N/A
AREAS OF RESPONSIBILITY
Inspection; AIP and acceptance by Local Council; Assessment for abnormal vehicles including checking in accordance with AIP; Reporting.
PRINCIPAL ELEMENTS
- 3 masonry arch bridges up to 3.3m span
- 2 corrugated steel buried structures (8.0m)
- 2 prestressed beam skew bridges (12m)
- 2 reinforced concrete beam and slab (3 spans 36.6m + single 17.2 span)
KEY FEATURES
Also reassessment of 2 small bridges on B743 for revised loadings;
Review of existing assessments.
CONTRACTORS
Project Manager – Wallace Stone