COIGACH WIND TURBINE BRIDGE ASSESSMENTS
PROJECT DESCRIPTION
Assessment of bridges on transport route for wind turbine.
Client – Coigach Wind Power
Completion – 2015
Value – N/A
AREAS OF RESPONSIBILITY
Assessment and report for abnormal load movement.
PRINCIPAL ELEMENTS
- Bridge forms – 2 span steel longitudinal trough
- 2 single span precast beams
- 1 single span rc slab
- 1 steel Mabey Quick bridge
- Minor culverts and retaining walls
KEY FEATURES
Assessment for abnormal loads to BD21; inspection for assessment. Research historic forms of construction.
CONTRACTORS
Project Manager – Wallace Stone
Main Contractor – N/A