SCRABSTER CRUISE BOAT PONTOONS

PROJECT DESCRIPTION

Provision of 40m length of 4m wide pontoons for use by cruise ship personnel transfer boats.

Client – Scrabster Harbour Trust

Completion – 2017

Value – £140k

AREAS OF RESPONSIBILITY

Survey work; concept design; preparation of tender documents, pontoon layout drawings and tendering; site supervision and project management.

PRINCIPAL ELEMENTS

  • Pile guides fitted to sheet piling
  • 24m long access bridge
  • 40m x 4m wide pontoons with high freeboard

KEY FEATURES

Due to high water levels, a quayside support frame for the access bridge was required.

CONTRACTORS

Project Manager – Wallace Stone

Main Contractor – Inland & Coastal Marina Systems Ltd