SCRABSTER CRUISE BOAT PONTOONS
PROJECT DESCRIPTION
Provision of 40m length of 4m wide pontoons for use by cruise ship personnel transfer boats.
Client – Scrabster Harbour Trust
Completion – 2017
Value – £140k
AREAS OF RESPONSIBILITY
Survey work; concept design; preparation of tender documents, pontoon layout drawings and tendering; site supervision and project management.
PRINCIPAL ELEMENTS
- Pile guides fitted to sheet piling
- 24m long access bridge
- 40m x 4m wide pontoons with high freeboard
KEY FEATURES
Due to high water levels, a quayside support frame for the access bridge was required.
CONTRACTORS
Project Manager – Wallace Stone
Main Contractor – Inland & Coastal Marina Systems Ltd