NAIRN PONTOONS PHASE 1 & PHASE 2
PROJECT DESCRIPTION
Replacement Pontoons within an historic harbour utilizing existing mooring piles.
Client – Highland Council
Completion – 2008
Value – £60k
AREAS OF RESPONSIBILITY
Scheme design, procurement, contract management and site supervision.
PRINCIPAL ELEMENTS
- Main Pontoon 57m long, 2.5m wide
- Finger units 8no. 6.2m long, 1m wide
- Mooring system Cantilever Piles
KEY FEATURES
Careful design to maximise berth widths and minimise pile fouling at existing piling layout; high quality detailing; ducting for future provision of services.
CONTRACTORS
Main Contractor – Varis Engineering