GAIRLOCH PONTOONS
PROJECT DESCRIPTION
Pontoon facility for visiting yachts, local small boats and landing catch from small fishing boats.
Client – Gairloch Community Harbour Association
Completion – 2002
Value – £80,000
AREAS OF RESPONSIBILITY
Feasibility, topographical & bathymetric survey, assessment of wave climate, design, supervision, contract management, liaison with local users.
PRINCIPAL ELEMENTS
- 120 lin. metres of berthing
- Chain & anchor mooring system
- 24m access bridge
- Concrete shore block with service ducts
KEY FEATURES
Carefully detailed design for lively wave climate, extra long access bridge to limit gradient at low water, designed to allow future conversion for wheelchair access and installation of shore to vessel hoist.
CONTRACTORS
Main Contractor – Varis Engineering
Mooring – North West Marine