WEMYSS BAY FERRY TERMINAL REFURBISHMENT

PROJECT DESCRIPTION

Significant refurbishment works to fender system, pier deck and linkspan during a challenging closure period. Works also included dredging of berth and approach.

Client – Caledonian Maritime Assets Ltd.

Completion – 2016

Value – £5m

AREAS OF RESPONSIBILITY

Outline design and concept development for: Civil Works and PMF fendering system. Detailed design of marine civil works including; demolition of concrete deck, piles and existing fendering system, repairs to existing structures, tubular steel bearing piles, fender piles, reinforced concrete deck (3te/m2), quayside area slabs; general drainage and services. Site Supervison and Project Mangement.

PRINCIPAL ELEMENTS

  • Tubular steel piles 400 te
  • PMF fendering system
  • Dredging 5000 m3.
  • Quayside furniture & Services.
  • Concrete decks and pile infill 250 m3

KEY FEATURES

Rapid development of detailed design to a very tight programme. Deck comprised precast components and fendering fabricated offsite to enable speedy construction on site.

CONTRACTORS

Project Manager – CH2M

Main Contractor – George Leslie Ltd.