LOCHBOISDALE PORT OF ENTRY PROJECT
PROJECT DESCRIPTION
Improvements to jetty including lengthening, heightening, low level landing stage, and all tide berth. Protective rubble mound breakwater providing shelter to Slipway. Walkway on breakwater crest, protected by armour stone wave wall.
Client – The Highland Council
Completion – 2000
Value – £0.3m
AREAS OF RESPONSIBILITY
Feasibility study, conceptual design, detailed design, project management, full-time supervision of all site work, including underwater inspection of concrete and breakwater armour.
PRINCIPAL ELEMENTS
- Breakwater Rock Armour – 10000m³
- Breakwater Rock Core – 4000m³
- Slipway Rockfill – 200m³
- Slipway Reinforced Concrete – 150m³
- Low Water Berth and walkway Concrete – 100m³
KEY FEATURES
Breakwater constructed with materials from foreshore. Improvements in accessibility, flexibility and protection of existing slipway.
CONTRACTORS
Black Isle Civil Engineering