PENNYGHAEL PIER
PROJECT DESCRIPTION
Dedicated timber loading facility using a mobile, floating jetty, connected by bridge to a rock armoured approach causeway, and timber stacking area.
Client – UPM Tilhill
Completion – 2012
Value – £0.6m
AREAS OF RESPONSIBILITY
Feasibility study, obtaining consents, detailed design, project management, site supervision and CDM Coordination.
PRINCIPAL ELEMENTS
- Excavation of rock for causeway armour – 3815m3
- Excavation of rock fill for causeway – 4640m3
- Otter culverts – 2no.600mm diameter pipes
- Stacking area – 2000m2
KEY FEATURES
Economical provision of rock and armour by excavation adjacent to site, also providing stacking area; highly cost-effective means of exporting timber.
CONTRACTORS
Project Manager – Wallace Stone
Main Contractor – TSL Contractors Ltd