LERWICK OIL JETTY FENDERING
PROJECT DESCRIPTION
Improvements to existing jetty fendering to provide increased energy absorption, realignment of the berthing face to improve water depth at the berth, and improved loading arm fit-up geometry to the tankers.
Client – BP Oil UK Ltd
Completion – 2006
Value – £60k
AREAS OF RESPONSIBILITY
Survey; Inspection; Conceptual Design; Detailed Design and Specification; Project Management; Supervision of all site work.
PRINCIPAL ELEMENTS
- Structural Steelwork 12t
- Timber Fendering 2 no. 3m lengths
- Fender Panels 2 no. 4m x 1m
- Fender Elements 4 no. EV 750 x 750 A
KEY FEATURES
Sensitive design solution for improvements to an existing jetty fendering to maximise the energy absorption of the proposed fendering without overloading the existing structure as a whole or the existing timber fender piles to which the new fenders were attached.
CONTRACTORS
Main Contractor – Tulloch Developments Ltd
Fender Supplier – Burleigh Marine Systems Ltd