KERRACHER LANDING STAGE
PROJECT DESCRIPTION
Small, flexible economical landing stage providing access at all states of the tide to boat trips carrying visitors to gardens of outstanding beauty and variety.
Client – Peter & Trisha Kohn
Completion – 1999
Value – £14k
AREAS OF RESPONSIBILITY
Feasibility study, site surveys, cost estimates, conceptual design, detailed design, supervision of construction and underwater construction.
PRINCIPAL ELEMENTS
- Structural timber – 110 lin. m.
- Concrete – 10 m³
- Steel Dowels – 80 No
- Galvanised steel brackets – 400 kg
KEY FEATURES
The landing stage was constructed manually.
Unique and highly successful, co-operative venture with client and designer working alongside contractor. Use of available materials at remote location. Construction by manual labour only, due to lack of access for plant. Usable at all states of the tide.
CONTRACTORS
Northwoods Construction
Peter & Trisha Kohn
Wallace Stone
Ewen MacKay