CROVIE PIER REPAIRS
PROJECT DESCRIPTION
Reconstruction of Crovie Pier following storm damage which completely destroyed the outer end of the pier. The T-head was rebuilt in mass concrete with wave wall. Approach pier resurfaced and refaced on inside with concrete and mesh reinforcement.
Client – Crown Estate
Completion – 2013
Value – £220,000
AREAS OF RESPONSIBILITY
Site survey and inspection; Detailed design and preparation of tender documents; procurement; site supervision and project management.
PRINCIPAL ELEMENTS
- Concrete 350m³
KEY FEATURES
Very remote and exposed location; with difficult access; outer end of pier under water during spring tides; simple design approach required to make repair economic and feasible.
CONTRACTORS
Project Manager – Wallace Stone
Main Contractor – George Leslie Ltd