CORPACH MARINA
PROJECT DESCRIPTION
Reclamation for parking; slipway; facilities building and marina.
Client – George Leslie Ltd
Completion – 2023
Value – £1.35 million (Civil and Building works only)
AREAS OF RESPONSIBILITY
Design of reclamation area including rock armoured perimeter; 4.0m span precast box culvert for diversion of existing stream, tied into existing bridge under access road; concrete slipway and retaining walls; structural design of facilities building.
PRINCIPAL ELEMENTS
Precast reinforced concrete box culvert (detailed design by precast sub-contractor). Reclamation fill (partly from dredging at marina area) and perimeter rock armour. Drainage including for building. Design of single storey timber framed facilities building with exposed glulam beams in café area and external canopy.
KEY FEATURES
- Rock armour
- Earthworks
- Precast concrete culvert
- Slipway and retaining walls
- Single storey timber framed facilities building
CONTRACTORS
Project Manager – Caol Regeneration Company
Designer (for contractor) – Wallace Stone
Marina – Gael Force
Main Contractor – George Leslie Ltd