CORPACH MARINA

 

PROJECT DESCRIPTION

Reclamation for parking; slipway; facilities building and marina.

Client – George Leslie Ltd

Completion – 2023

Value – £1.35 million (Civil and Building works only)

AREAS OF RESPONSIBILITY

Design of reclamation area including rock armoured perimeter; 4.0m span precast box culvert for diversion of existing stream, tied into existing bridge under access road; concrete slipway and retaining walls; structural design of facilities building.

PRINCIPAL ELEMENTS

Precast reinforced concrete box culvert (detailed design by precast sub-contractor).  Reclamation fill (partly from dredging at marina area) and perimeter rock armour.  Drainage including for building.  Design of single storey timber framed facilities building with exposed glulam beams in café area and external canopy.

KEY FEATURES

  • Rock armour
  • Earthworks
  • Precast concrete culvert
  • Slipway and retaining walls
  • Single storey timber framed facilities building

CONTRACTORS

Project Manager –  Caol Regeneration Company

Designer (for contractor) – Wallace Stone

Marina  – Gael Force

Main Contractor  – George Leslie Ltd