COIGACH WIND TURBINE BRIDGE ASSESSMENTS

PROJECT DESCRIPTION

Assessment of bridges on transport route for wind turbine.

Client – Coigach Wind Power

Completion – 2015

Value – N/A

AREAS OF RESPONSIBILITY

Assessment and report for abnormal load movement.

PRINCIPAL ELEMENTS

  • Bridge forms – 2 span steel longitudinal trough
  • 2 single span precast beams
  • 1 single span rc slab
  • 1 steel Mabey Quick bridge
  • Minor culverts and retaining walls

KEY FEATURES

Assessment for abnormal loads to BD21; inspection for assessment. Research historic forms of construction.

CONTRACTORS

Project Manager – Wallace Stone

Main Contractor – N/A