Tough Mudder!

The Wallace Stone Glasgow office has undertaken the Tough Mudder Challenge, raising £2,000 for Beatson Cancer charity.

Kishorn Drydock

Wallace Stone has enabled this facility, which has lain dormant for over forty years, to become operational again. It was built in the 1970s for the construction of the Ninian platform, and its refurbishment will now allow for decommissioning of oil rigs or for the...

Glen Nevis Footpath Bridge

Wallace Stone has designed an impressive 42 metre span bridge, sympathetic to its natural surroundings, on the footpath to Glen Nevis. This structure replaces the pre-existing bridge, which was no longer fit for purpose.

Brodick Ferry Terminal

Works are currently underway on site at Brodick to construct the new Brodick Ferry Terminal. Wallace Stone submitted an alternative tender design with contractor George Leslie for the marine works at Brodick Ferry terminal which offered significant cost savings over...

30 years at Glensanda Super Quarry

It’s the 30 year anniversary of the opening of Glensanda Super Quarry. Wallace Stone undertook the original design of the loading berth and have been closely involved with the design and management of the marine assets over the lifetime of the site. Further works...

Inverie Hydro Dam improvements a success

The intake pipe through the dam was replaced in an effort to improve the flow into the system and increase generating capacity. The dam is located 1100 ft above Inverie with access only by foot. This presented a logistical challenge for both design and construction as...

Wemyss Bay Ferry Terminal

Wemyss Bay Ferry Terminal was successfully re-opened on Good Friday (25th March 2016) following an ambitious programme of repairs, refurbishment and reconstruction. The £5.0M of works were completed during a 6 month closure window which required the main ferry service...

Garden Bridge Project, London

Wallace Stone appointed to design temporary marine works for Prestigious Garden Bridge Project on the River Thames.

Kyleakin Feedmill Pier

Wallace Stone have been appointed to undertake the design of a new pier for the proposed Marine Harvest Feedmill site at Kyleakin.

Laura Stoddart joins the Institution

Congratulations to Laura on achieving Chartered Status as an Eng Tech Member of the Institution of Civil Engineers. Laura is our Chief Technician, and combines great skill and experience in technical draughting with a high level of intuitive Engineering ability. She...

New Associate

We welcome Nigel Greenwood, highly experienced Structural and Bridge Engineer to his new role as Associate. Working from our Dingwall office, Nigel has brought an extra area of expertise to the practice in bridge design, and has brought a whole range of new clients to...

ISO 9001 Accreditation

Having cleared the final auditing hurdles, Wallace Stone now have a Quality Management System, fully accredited to ISO 9001. The journey has been interesting and has allowed us to refine and expand our existing procedures, objectives and targets, and management...