New bridge construction on the B851.

B851 WHITEMILL BRIDGE

New single skew span bridge with approximately 700m of two lane roadworks bypassing existing two span masonry arch.

PROJECT DESCRIPTION

Client R J McLeod (Contractors) Ltd

Completion 2013

Value £1.25m

New road leading to Whitemill Bridge.

Design of road and bridge including obtaining consents; supervision visits during construction.

  • Bridge span 14m, skew 45° - precast prestressed TY beams
  • 700m of 6.0m carriageway road with several field accesses
  • Drainage

PRINCIPAL ELEMENTS

AREAS OF RESPONSIBILITY

Construction of new Whitemill Bridge.

KEY FEATURES

Design for contractor; constructed as part of enabling works for a wind farm.

CONTRACTORS

Project Manager - Wallace Stone

Main Contractor - R J McLeod (Contractors) Ltd for Client Renewable Energy Systems

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design