New footbridge constructed for the Cairngorms Outdoor Access Trust.

STRATHDON FOOTBRIDGE

New 23m span footbridge as part of path network.

 

PROJECT DESCRIPTION

Client Cairngorms Outdoor Access Trust

Completion 2012

Value £92,000

Timber Approach Ramp leading to new bridge.

AREAS OF RESPONSIBILITY

Design and construction of new footbridge with open grid grp deck, and 20m long timber approach ramp over flood plain.

 

 

 

 

  • Steel beams curved in elevation
  • Timber approach ramp over flood plain
  • Reinforced concrete substructure

PRINCIPAL ELEMENTS

KEY FEATURES

Steel beams curved in elevation under new bridge.

Planning application – timber handrails; Design for equestrian loading; Access for construction to bank remote from public road.

 

 

 

 

CONTRACTORS

Project Manager - Wallace Stone

Main Contractors - Hunter Construction Ltd

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design