Assesment of the bridge at Milltown of Towie.

C67M MILTOWN OF TOWIE BRIDGE ASSESSMENT

PROJECT DESCRIPTION

Assessment of existing 1920s four span reinforced concrete beam and slab bridge carrying minor road over River Don.

Client Aberdeenshire Council

Completion 2013

Value N/A

Inspection of the bridge.

AREAS OF RESPONSIBILITY

Inspection; planning and supervision of concrete investigation works; assessment including category 2 check.

  • 4 spans 4.5/15.6/15.6/4.5 metres single track bridge
  • Two main beams, cross beams and deck slab
  • concrete solid parapet
  • Allow for deterioration of concrete

PRINCIPAL ELEMENTS

Bridge assesment.

KEY FEATURES

Inspection; investigations; assessment in present condition.

CONTRACTORS

Project Manager - Wallace Stone

Main Contractor - Henderson Thomas Associates (Concrete Investigations)

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design