Major new 50 berth marina for leisure vessels and visiting yachts, including substantial dredging and full services.
Client Mallaig Harbour Authority
Completion 2011
Value £0.95m
Feasibility study, obtaining consents, assisting with funding, detailed design, managing and supervising three separate contracts (dredging; shoreworks; pontoons, moorings and services).
Close consultation with local stakeholders; careful orientation of berths to suit wave climate; detailing of layout to avoid rock outcrops.
Project Manager - Wallace Stone
Main Contractor - Varis Engineering; Coastworks; MacLaughlin & Harvey
SOUTH OFFICE
Doges Studio 2
Templeton on the Green
62 Templeton Street
Glasgow
G40 1DA
Tel 0141 554 8233
Fax 0141 554 4727
NORTH OFFICE
Royal Bank Buildings
High Street
Dingwall
Ross-shire
IV15 9HA
Tel 01349 866775
Fax 01349 863197
HEBRIDES OFFICE
21 Tobson, Bernera
Isle of Lewis
Western Isles
HS2 9NA
Tel 01851 612454
Fax 01851 612352
Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145
Website by Skocia Web Design