Access Bridge and Pontoons at Mallaig Marina.

MALLAIG MARINA

Major new 50 berth marina for leisure vessels and visiting yachts, including substantial dredging and full services.

PROJECT DESCRIPTION

Client Mallaig Harbour Authority

Completion 2011

Value £0.95m

Access Bridge leading to Pontoons.

AREAS OF RESPONSIBILITY

Feasibility study, obtaining consents, assisting with funding, detailed design, managing and supervising three separate contracts (dredging; shoreworks; pontoons, moorings and services).

PRINCIPAL ELEMENTS

  • Extensive plough dredge - 12,000m3
  • Reclamation and armouring - 1,500m3
  • Double access bridge with support platform
  • 50 berth pontoons, mooring system and services

Close consultation with local stakeholders; careful orientation of berths to suit wave climate; detailing of layout to avoid rock outcrops.

KEY FEATURES

\pontoons at Mallaig.

CONTRACTORS

Project Manager - Wallace Stone

Main Contractor - Varis Engineering; Coastworks; MacLaughlin & Harvey

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design