PROJECT DESCRIPTION

Gravity sewers, storm water outfalls and pumping main, including underwater crossing of entrance to Peterhead Harbour. Temporary and permanent pumping stations.

Client Grampian Regional Council

Completion 1993

Value £1.0m

AREAS OF RESPONSIBILITY

Construction Work - Conceptual design and detailed design - Hydrographic surveying, under-water setting-out and inspection Mechanical and Electrical Installations - Conceptual design, detailed specification - Acceptance procedures General - Project management, supervision

PRINCIPAL ELEMENTS

  • Pumping Station - 60 l/s
  • Gravity Sewers (150 600mm dia.) - 1,300m
  • Pumping Main (300mm dia.) - 1,000m

KEY FEATURES

Planning and phasing of works to minimise disruption to congested fishmarket and fish processing areas. Design of 50 metre long steel carrier tube, incorporating twin pumping mains, water main and service duct to allow rapid installation across busy harbour entrance. Design of compact pumphouse to suit limited land available whilst incorporating advanced safety features.

CONTRACTORS

Pumping Main and Temporary Pumping Station - RJ McLeod (Contractors) Ltd

Sewers, Outfalls and Pumping Station - RJ McLeod (Contractors) Ltd

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design