Repair work at Crovie Pier after damage from storms.

CROVIE PIER REPAIRS

PROJECT DESCRIPTION

Reconstruction of Crovie Pier following storm damage which completely destroyed the outer end of the pier. The T-head was rebuilt in mass concrete with wave wall. Approach pier resurfaced and refaced on inside with concrete and mesh reinforcement.

Client - Crown Estate

Completion - 2013

Value - £220,000

Showing the end of the pier.

AREAS OF RESPONSIBILITY

PRINCIPAL ELEMENTS

Site survey and inspection; Detailed design and preparation of tender documents; procurement; site supervision and project management.

  • Concrete 350m³
Work underway on repairs to Crovie Pier.

KEY FEATURES

Very remote and exposed location; with difficult access; outer end of pier under water during spring tides; simple design approach required to make repair economic and feasible.

CONTRACTORS

Project Manager - Wallace Stone

Main Contractor - George Leslie Ltd

 

 

Damage to the pier at Crovie from storms.
Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design