Repir of existing dock at Carbost.

CARBOST SEA ACCESS PHASE 1

PROJECT DESCRIPTION

Repairs to existing pier deck slab by casting new deck on top of old slab and reusing concrete piles. Minimised concrete repair works to save cost. Upgrade of access road and formation of passing bays and car parking adjacent to pier.

Client - Carbost Pier Ltd

Completion - 2012

Value - £120,000

Upgrade of existing road at Carbost.

AREAS OF RESPONSIBILITY

Site surveys and inspections; design of works; preparation of tender documents, procurement, site supervision and project management.

PRINCIPAL ELEMENTS

KEY FEATURES

  • Concrete 81m³
  • Resurfacing of turning area 185m²
  • Length of road upgrade 450m

Economical restoration of pier to commercial use; substantial benefits to local community group.

Upgrading access road and formation of parking bays and car park at Carbost.

CONTRACTORS

Project Manager - Wallace Stone

Main Contractor - Telford Construction

 

 

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design