New footbridge to replace damaged bridge at Canna.

CANNA - SANDAY BRIDGE

PROJECT DESCRIPTION

New footbridge to replace old bridge destroyed by storm waves.

Assessment of wave climate, conceptual design, detailed design, construction drawings, supervision operating as design/build partner to contractor.

PRINCIPAL ELEMENTS

Client RJ McLeod

Completion 2006

Value £0.25m

AREAS OF RESPONSIBILITY

Overview of new bridge.
  • Reinforced concrete bases
  • Reinforced concrete piers
  • Steel beams
  • Timber decking
  • Timber handrails & kerbing
  • Rock armour & stone facing

KEY FEATURES

Very robust design, appropriate and sympathetic detailing, designed to shed timber decking before collapse of piers in extreme overload conditions.

CONTRACTORS

Main Contractor - RJ McLeod (Contractors) Ltd

Copyright © 1973- Wallace Stone
Wallace Stone is a member of the Association for Consultancy and Engineering.
Wallace Stone is a BM TRADA accredited company.

SOUTH OFFICE

Doges Studio 2

Templeton on the Green

62 Templeton Street

Glasgow

G40 1DA

 

Tel 0141 554 8233

Fax 0141 554 4727

NORTH OFFICE

Royal Bank Buildings

High Street

Dingwall

Ross-shire

IV15 9HA

 

Tel 01349 866775

Fax 01349 863197

HEBRIDES OFFICE

21 Tobson, Bernera

Isle of Lewis

Western Isles

HS2 9NA

 

 

Tel 01851 612454

Fax 01851 612352

Wallace Stone is the trading name of Wallace Stone LLP. registered in Scotland Number SO301145

Website by Skocia Web Design